解开警花的裙子猛烈进入_第一版主精品h_唐朝公主性艳史电影_岳好紧我要进去

中文

Sanfeng Environment Won the Bid for New Projects in Dianjiang, Chongqing and Jiaozuo, Henan


Recently, Chongqing Dianjiang Public Resource Trading Center issued an announcement confirming that Sanfeng Environment won the pre-bid for the county’s Waste-to-Energy project.

image.png

The total investment of the project is about 320 million yuan, with a franchise period of 30 years (including 2-year construction period), serving the entire country of Dianjiang. The project plans to build one Waste-to-Energy plant, which will be constructed in stages according to the increase in the amount of domestic waste incineration. In the first phase, a waste incineration line with a processing capacity of 400 tons/day and a 9MW condensing gas turbine generator set will be constructed, and a production line construction site of 400 tons/day will be reserved for the second phase. The project is also equipped with a kitchen waste treatment project, with a processing capacity of 60 tons/day. 

Previously, the Henan Provincial Government Procurement Network issued an announcement confirming that the consortium including Sanfeng Environment and other 2 companies won the bid for Jiaozuo Vein Industrial Park east park project.

image.png

The total investment of the project is about 18.97 billion yuan, including Waste-to-Energy project, municipal sludge treatment project (co-processing), park sewage treatment project, park management center, transfer station and landfill closure. The Waste-to-Energy project has a processing scale of 2,000 tons/day, and is equipped with two 1,000 tons/day mechanical grate incinerators and one 50MW extraction-condensing steam turbine generator set, and the boiler adopts medium temperature and sub-high pressure parameters.


Address: 3 Jianqiao Avenue, Jianqiao Industrial Park, Dadukou District, Chongqing, China Tel:(+86) 8805 5666

Chongqing Sanfeng Environment Group Corp. Ltd. All Rights Reserved 渝ICP備50010402000216號